Published

A burst pipe is flooding a shop, and an emergency crew arrives before the adjuster can visit. By the time the adjuster arrives, water has been pumped out and flooring removed. A useful claim file shows which observations describe the original loss, which describe mitigation, and which come from the later inspection.
Record the original condition, the mitigation, and the later inspection as separate observations with a shared claim timeline.
Connect early photographs and statements to the location, observer and reported time.
Keep work orders, removed-material records and drying logs with the work they describe.
Link findings and measurements to earlier evidence, with unresolved differences assigned for follow-up.
Retain the submitted photos and emergency work order with the submitter and receipt time. Record the reported capture time and location separately, and flag any uncertainty. A photograph uploaded on Tuesday may describe Monday's condition. A device timestamp can support the account, while a wrong clock or forwarded copy may need clarification.
If a contractor provides a marked-up copy, link it to the submitted original and keep both. Label what the annotation explains, who added it and when. A short intake form can capture the room or equipment, the observer, the phase of the work and the question the document helps answer.
Group evidence by the original condition, work performed, and later condition. Connect invoices and work logs to the mitigation actions they document. When two sources describe different damage, record the difference and assign follow-up. Request corroborating material only where relevant, and preserve the evidence available when an assessment is made.
Track document receipt and review outcomes separately. The handler might have every requested file while a photograph's location is still unclear. Additional evidence can change an assessment; retain the earlier summary, the new material and the reason for the revised review.
| Evidence phase | Supporting records | Question for review |
|---|---|---|
| Before work | Early photographs, reported observations and the initial loss description. | What condition was visible, where, and to whom? |
| During mitigation | Work orders, contractor photographs, drying logs and records of removed materials. | Which materials were removed or protected, and why? |
| After mitigation | Inspection notes, measurements and remaining questions. | What remained for the adjuster to see and measure? |
In a fictional shop claim, staff photographs show standing water beneath the sales counter and intact wall panels. The emergency crew removes affected panels and starts drying before the adjuster's visit. The handler organises the evidence in the claim file:
The staff photographs identify the counter area and reported capture time. The handler records who supplied them and retains the original files. One image has no reliable time, so its timing remains an open question.
The contractor's work order and removal photographs identify the panels taken out. Its equipment log arrives the following day, but records the earlier drying work. The handler links those records to the same location and work phase.
The adjuster adds later moisture readings and reviews the original photographs alongside the contractor's records. The summary explains why the visit found exposed walls and which questions remain unresolved. A later correction to the contractor's log prompts review of the affected finding while the earlier log and summary remain available.
Sometimes no photograph of the original condition is available. Record the gap and the observer's account, including when that account was collected. Keep later measurements identified as later observations. The reviewer can then distinguish what was documented at the time from what was recalled or inferred.
Assign a specific follow-up question to an owner, such as identifying which wall a photograph shows or reconciling a contractor's two dates. Keep the answer and its source with the claim. Coverage, repair authorisation and settlement follow the applicable claim process; organising the evidence supports that assessment.
When urgent work changes a scene, the phase and provenance of each document help the reviewer reconstruct the loss. Preserve those details while the people who observed it can still supply them.
The open-source foundation — API-first, deployable into your own AWS account, and free to use. Right for architecture validation and early implementation.
Production-ready editions for departments and complex workflows. Start with a Proof-of-Value deployment or go straight to production.
For governance-heavy environments with residency, sovereignty, assurance, and multi-jurisdiction requirements. Talk to us about the right deployment model.