Supplier Certificates: Check the Site and Scope

Connect the certificate to the facility, activity and order it needs to support

Published

Teal line-art certificate and site schedule connected to two factories and an order-review file on a dark background, with the FormKiQ wordmark

A supplier proposes moving a component order to a second plant. Procurement has a current quality certificate on file, but its site schedule lists the second plant for warehousing. The order requires fabrication and heat treatment. Someone needs to resolve that difference before relying on the certificate for the changed order.

Check the named entity, facility, activity and applicable period against the work being purchased. Keep the evidence and decision specific enough to explain why this order could proceed at this site.

Check coverage and current status

Read the certificate alongside any site schedule, appendix or supporting scope statement. Capture the issuing body, certificate reference, named legal entity, relevant facility address, activity and effective dates. Identify the page or schedule entry that supports the proposed work. Keep an unclear or missing site entry assigned for follow-up.

For certification to an ISO standard, ISO's certification guidance explains that external certification bodies issue certificates. It describes verification through the issuing or accreditation body, or a suitable certification database. Record the source and time of your status check as well as the copy reviewed.

Treat the following as a practical procurement review against the buyer's approved requirements. The certificate, its current status and the buyer's qualification decision each contribute evidence. A future expiry date alone leaves the site-and-activity question unanswered.

Questions to resolve for the proposed work; the buyer defines the applicable evidence requirements.
BoundaryCheck against the orderRetain with the decision
Legal entityWhich supplier actually performs the work, including any subcontracted step?The named entity and its authoritative purchasing-system reference.
FacilityDoes the proposed physical location match the relevant site entry?Facility reference, address and the certificate or schedule entry reviewed.
ActivityDoes that site's stated scope address the operation required by the buyer?Scope text, ordered activity and the reviewer's conclusion or evidence request.
PeriodDoes the reviewed evidence apply during the planned work, and what status was verified?Effective dates, status-check result and any unresolved coverage interval.

Review the changed order without widening approval

Keep the certificate's document-review state separate from eligibility for a particular facility, operation and order. One accepted certificate can support several scoped decisions. A request to move production should identify the affected work and the earlier decision it changes.

  1. 1 · Identify

    Define the proposed change

    Connect the order, original site, proposed site, required activity and planned work period.

  2. 2 · Review

    Resolve the scope question

    Inspect the relevant evidence and assign gaps to procurement, quality or the supplier contact.

  3. 3 · Confirm

    Record the purchasing outcome

    Keep the authorised decision and the purchasing system's resulting state connected to the order.

Where the buyer's rules and applicable requirements permit an exception, record its authority, affected orders, conditions, expiry and follow-up. Keep other accepted site-and-activity decisions intact unless the new information also calls them into question. A broader suspension requires its own assessment and authority.

Worked example: one order, two plants

In this fictional example, the buyer requires evidence covering fabrication and heat treatment at the production site. Its purchasing procedure keeps a proposed site change under review until the designated owner accepts the supporting evidence.

  1. Record the proposed move

    The supplier asks to move order PO-204 from Plant A to Plant B. Procurement connects the request, required operations and proposed production period to the supplier file in FormKiQ.

  2. Compare the actual scope

    The current schedule covers Plant A's fabrication and heat treatment, but lists Plant B for warehousing. Quality records the relevant entries and the gap for PO-204. Plant A's earlier approval for its covered work remains available.

  3. Request and review the missing evidence

    The supplier provides a revised schedule extending Plant B's scope. Procurement verifies its status and effective date. Because it takes effect after the original proposed production start, the purchasing owner arranges a later start within the reviewed period before accepting the change.

  4. Confirm the order's new state

    The authorised owner records acceptance for PO-204 at Plant B, with the revised timing and reviewed schedule. Through the configured purchasing integration, the ERP returns the order-change result. The file retains the original request, scope gap, revised evidence, decision and external confirmation.

An approval in FormKiQ records the document-workflow decision. Confirm the purchasing-system result before treating its order change as complete. If the update fails or the site or work dates change again, keep the follow-up visible and review the affected decision.

Keep the history useful to the next reviewer

Retain the certificate and schedule version actually assessed, the status check, reviewer, decision time and affected order. A later extension of scope should remain distinguishable from the earlier evidence. Keep the original source references when capturing an updated certificate or a new assessment.

Give procurement and quality teams access appropriate to their department and task. Supplier-facing evidence requests can identify the missing site or activity while internal risk comments remain restricted. Configure those audiences separately from any purchasing status exchanged with the ERP.

For the wider collection and renewal process, see Vendor Compliance Documents: Collection to Renewal. If the supplier's ERP accounts are merged, preserve the account mapping and evidence scope when reconnecting the records.

Check one alternate-site request

  • The order identifies the supplier, proposed facility, required operations and work period.
  • The reviewed certificate and any schedule are linked with the relevant scope entry.
  • Current status and effective dates have a recorded verification source and time.
  • The authorised decision applies to the specified work; any exception has defined conditions and follow-up.
  • The purchasing-system result is recorded, with failed or unresolved updates assigned.
  • Earlier evidence and unaffected approvals remain retrievable under appropriate access controls.

Make the approval fit the work

Keep the certificate, covered site and activity, applicable period and order decision connected. When production moves, reviewers should be able to see exactly what changed, which evidence supported it and what purchasing actually did.

      Start with FormKiQ Core

      The open-source foundation — API-first, deployable into your own AWS account, and free to use. Right for architecture validation and early implementation.

      Get Started Free

      Deploy FormKiQ Essentials or Advanced

      Production-ready editions for departments and complex workflows. Start with a Proof-of-Value deployment or go straight to production.

      Explore Options

      Plan an Enterprise Rollout

      For governance-heavy environments with residency, sovereignty, assurance, and multi-jurisdiction requirements. Talk to us about the right deployment model.

      Book a Call