EUDAMED: Which Existing Devices Need a Registration Review?

Keep device identity, market-placement evidence and the registration decision together

Published Updated

Grey and purple illustration connecting a medical device, European market records and a registration file, with an EU flag and the FormKiQ wordmark

A medical-device manufacturer is reviewing its EU catalogue before November 28. One device is still being supplied, another configuration has left the market, and a legacy record may overlap an existing registration. A single “registration complete” flag on the product family cannot explain what the regulatory team checked.

Review each applicable device identifier against its market-placement evidence. Keep the regulatory decision and the actual EUDAMED registration outcome with that record. EUDAMED is the European Database on Medical Devices; this guide focuses on the evidence behind an existing-device review.

What the November 28 transition covers

The Commission’s EUDAMED rollout guidance confirms that the first four modules, including UDI/Devices, became mandatory on May 28, 2026. Its device-registration timeline gives November 28, 2026 as the registration deadline for the illustrated transition: a legacy or Regulation device’s first unit was placed on the market before May 28, and additional units are placed on or after that date.

A Regulation device complies with the Medical Devices Regulation (MDR) or In Vitro Diagnostic Medical Devices Regulation (IVDR); legacy devices rely on the relevant transitional arrangements. The transition provisions in Regulation (EU) 2024/1860 connect registration duties to the device’s regulatory route and continued market placement. Have the regulatory owner confirm the applicable provision and exceptions for each device.

For a Regulation device whose first unit is placed on the EU market on or after May 28, the Commission’s implementation Q&A, question 7, describes registration before that first placement. Plan that route separately from the November transition for existing devices.

Track safety-summary uploads separately. For devices that need a summary of safety and clinical performance (SSCP) or a summary of safety and performance (SSP), the October 2026 revision of MDCG 2026-4 describes manufacturer upload functionality planned for December 2026. For applicable devices placed on the market before mandatory use, the non-binding position paper recommends uploading the summary by March 27, 2027. Keep the November 28 UDI/Devices registration date where it applies. Record the validated summary version, certificate reference, manufacturer and notified-body responsibilities, and separate upload confirmation.

Start with the device identifier

The Q&A explains that UDI/Devices registration is at device-identifier level, excluding production identifiers such as lot or serial numbers. Use the UDI device identifier (UDI-DI), or the applicable legacy-device identifier, to connect the review to the correct regulatory source record. Keep product-family and catalogue references as useful context.

Question 8 addresses devices no longer placed on the market and legacy devices already covered by a registration of the same Regulation device. Check identity and shared characteristics with the regulatory owner; a similar trade name alone leaves the comparison unresolved. Record any post-market surveillance or vigilance question for assessment under the applicable reporting arrangements. Custom-made and investigational devices, and devices for performance studies, require separate scope checks.

A practical review file for each device identifier; these are suggested records for the workflow.
RecordEvidence to retainQuestion it answers
Device identityIdentifier, regulatory route, configuration and source-record reference.Which device does this decision cover?
Market placementDated source records supporting first and subsequent EU placements.Which transition facts did the reviewer establish?
Route assessmentRule or guidance used, existing-registration comparison, reviewer, decision date and open questions.Why was this action selected?
Registration outcomeSubmitted record version, captured EUDAMED reference or status, time checked and outstanding corrections.What actually happened after internal approval?

Use distribution and regulatory source evidence to establish market placement. An invoice date can be a useful lead, but the reviewer still needs to establish what transaction and device it represents. Keep the evidence assessed at the time, including gaps and later corrections.

Keep internal review and external registration traceable

  1. 1 · Gather

    Connect the source facts

    Identify the device and capture the placement records used in the assessment.

  2. 2 · Decide

    Record the regulatory review

    Approve the assessment or assign missing evidence to a named owner.

  3. 3 · Confirm

    Capture the external outcome

    Attach the actual registration result and track any correction or follow-up.

Give quality, regulatory and commercial staff the access appropriate to their department and task. Selected distribution evidence can support the regulatory review while its wider customer file remains restricted. Record who captured a portal status and when, so a later reviewer can distinguish that observation from the internal approval.

Worked example: two configurations, separate decisions

A fictional manufacturer reviews an established diagnostic reader and a configuration labelled retired. The following internal labels are example record references, not valid UDI values or EUDAMED registrations.

  1. Open the review for Reader A

    The owner connects the authoritative device identifier to placement evidence from March and September 2026. The regulatory lead confirms that the existing-device transition applies and records the November 28 action date.

  2. Resolve the retired configuration separately

    Reader B’s file contains an old catalogue entry but incomplete distribution evidence. Assign that gap to the commercial owner. Keep B under review while A proceeds, with the regulatory owner assessing any reporting implications.

  3. Review the exact registration package

    In FormKiQ, the owner links A’s assessment, source evidence and proposed submission record. A reviewer requests a corrected device reference; the corrected version returns for review with the earlier comments retained.

  4. Record what EUDAMED shows

    After the authorised staff member registers A in EUDAMED, attach the confirmation and the reference and status actually returned. Keep an assigned task open if a correction remains outstanding. B retains its own evidence request and decision history.

When evidence changes, preserve the earlier assessment and record why the decision was revisited. The controlled-revisions guide explains how to connect a specific reviewed version to its release decision. For US quality-system inspection evidence, see the separate FDA QMSR guide.

Check a representative device file

  • The review identifies the device, its regulatory route and the authoritative source record.
  • Placement evidence supports the transition facts used in the decision.
  • Existing-registration comparisons and scope exceptions have a regulatory owner.
  • The approved assessment identifies the document versions actually reviewed.
  • The EUDAMED outcome is captured separately from internal approval.
  • Missing evidence, corrections and future review triggers remain assigned and visible.

Sources reviewed: November 24, 2026. Recheck the Commission’s rollout material and the applicable MDR or IVDR provisions when making the device-specific decision.

Make each registration decision explainable

Connect the device identifier, placement evidence, reviewed assessment and actual registration outcome. That gives the next reviewer a usable record of what was decided, why it was decided and which follow-up remains.

      Start with FormKiQ Core

      The open-source foundation — API-first, deployable into your own AWS account, and free to use. Right for architecture validation and early implementation.

      Get Started Free

      Deploy FormKiQ Essentials or Advanced

      Production-ready editions for departments and complex workflows. Start with a Proof-of-Value deployment or go straight to production.

      Explore Options

      Plan an Enterprise Rollout

      For governance-heavy environments with residency, sovereignty, assurance, and multi-jurisdiction requirements. Talk to us about the right deployment model.

      Book a Call